| Hits |
2032 |
| Online Status |
OFFLINE |
| Member Since |
06/12/2004 14:59:47 |
| Last Online |
11/30/2008 07:53:38 |
| Connections |
0 |
My Bike
| Manufacturer: |
Yamaha |
| Model: |
Road Star XV1600 |
| Year: |
2003 |
| Exhaust: |
Bub Rinehart Flush |
| Manifold: |
Nemesis Racing |
| Carburetor: |
Mikuni HSR-42 |
| Engine Mods: |
| Nemesis 113ci big-bore, Nemesis Adjustable PushRods, Nemesis valve springs, Serdi valve job, Nemesis coils & wires, Bulldog 4ga starter wires, Warrior starter, gloss black iridescent rainbow powdercoated engine, chrome front end, HOK Candy Raspberry custom paint, Looney custom leather seat, VOES, '04 front brake system (chromed & powdercoated), ... |
My Jetting
| Needle Manufacturer: |
Mikuni |
| Needle Clip: |
3 |
| Jet Manufacturer: |
Mikuni |
| Main Jet Size: |
167 |
| Pilot Jet Size: |
25 |
| PMS Screw Manufacturer: |
Mikuni |
| PMS Turns Out: |
1.75 |
| My Elevation (ft): |
600 |
Articles
| Saturday, 13 September 2008 | Rear Wheel Alignment Jigs and Gadgets | 1000 |     / 0 |
| Friday, 29 August 2008 | Rear Wheel Alignment | 3198 |     / 4 |
| Saturday, 05 April 2008 | Wheel Removal and Installation | 7738 |     / 13 |
| Sunday, 11 November 2007 | Installing the Pistons and Cylinders | 3424 |     / 2 |
| Saturday, 03 November 2007 | Start Here: Complete Engine Tear Down | 7142 |     / 4 |
| Saturday, 03 November 2007 | Finishing Up | 2707 |     / 1 |
| Saturday, 03 November 2007 | Assembling the Top End | 2579 |     / 1 |
| Saturday, 03 November 2007 | Assembling and Installing the Transfer Case | 2640 |     / 1 |
| Saturday, 03 November 2007 | Assembling the Cam Area | 1989 |     / 1 |
| Saturday, 03 November 2007 | Assembling the Generator Area | 1833 |     / 1 |
| Saturday, 03 November 2007 | Assembling the Engine’s Left Side | 1827 |     / 1 |
| Saturday, 03 November 2007 | Assembling the Crankcases | 1953 |     / 7 |
| Saturday, 03 November 2007 | Working on the Disassembled Engine | 2004 |     / 9 |
| Saturday, 03 November 2007 | Removing and Disassembling the Crankcase | 1857 |     / 2 |
| Saturday, 03 November 2007 | Disassembling the Generator Area | 1831 |     / 10 |
| Saturday, 03 November 2007 | Disassembling the Cam Area | 1960 |     / 2 |
| Saturday, 03 November 2007 | Disassembling the Transfer Case | 2736 |     / 1 |
| Saturday, 03 November 2007 | Disassembling the Engine’s Left Side | 2185 |     / 1 |
| Saturday, 03 November 2007 | Disassembling the Top End and Cylinders | 2653 |     / 3 |
| Saturday, 03 November 2007 | Parts and Tools | 2432 |     / 1 |
| Saturday, 03 November 2007 | Starting the Project | 2196 |     / 1 |
| Saturday, 03 November 2007 | Going Full Bore | 3924 |     / 8 |
| Saturday, 20 October 2007 | Replacing Your Generator Stator and Your Rectifier/Regulator | 3998 |     / 15 |
| Thursday, 11 October 2007 | Installing a V.O.E.S. for the Mikuni HSR carburetor | 5900 |     / 13 |
| Wednesday, 10 October 2007 | Fixing the Starter Spin Problem | 4796 |     / 19 |
| Thursday, 04 October 2007 | Installing Nemesis or Dynatech Coils and Plug-Wires | 11870 |     / 29 |
| Saturday, 15 September 2007 | Installing Bulldogs Starter Cables and a Warrior Starter | 9377 |     / 11 |
Forum
| Forum Ranking | ![]() |
| Total Posts | 205 |
Friends
This user has no current connections.
......................................................................
......................................................................
......................................................................
......................................................................
......................................................................
......................................................................
......................................................................
......................................................................
......................................................................
-->